Importing from China
The China row in the table above is the reference case: 500 new industrial parts, $20,000 FOB, sea freight and FOB terms. Duty is assessed on CIF (customs value includes freight and insurance to the EU border), so the customs value is the goods plus international freight plus insurance. 19% VAT is then charged on that value plus duty, which means the tax base grows after duty is added. No origin-specific additional measure applies to China on this lane.
Landing the container is not the end of the cost. Clearance, port handling, inland delivery and documentation are modelled at $1,030, and cargo insurance at $103. A remote warehouse, a bonded transfer, demurrage or a customs exam pushes those lines higher. The buyer also needs a registered importer of record at Germany; a forwarder cannot transfer that status by contract. Replace each assumption with a confirmed figure before contracting.
How the duty band is set
The planning band for parts & components at this destination is 0%–2.7% of the CIF value, and this page uses 1.7% as the expected case. The band belongs to the category, not to a single product: your 8–10 digit national line carries the actual rate and may attract its own measures. The three HS candidates below usually cover the family, and each links to a duty file that compares the same code across the US, UAE and Saudi Arabia.
| HS line | Covers | Duty band |
|---|---|---|
| 8481.80 | Taps, cocks, valves and similar appliances | 0%–2.7% |
| 8483.90 | Parts for transmission shafts, gears and couplings | 0%–2.7% |
| 8538.90 | Parts for electrical apparatus for switching or protecting circuits | 0%–2.7% |
A part is classified by what it is and where it fits. The same machined item can be a part of a machine, a vehicle or an electrical assembly.
What changes the total
Freight mode. The comparison table uses a 40HQ reference of $2,850 from the base origin, multiplied by each origin factor. The worked sample instead moves 500 new industrial parts at 25 CBM and 10000 kg by fcl 40ft, so its freight line is $2,850. Do not compare that line with a container rate: they describe different shipments. Transit is 32–42 days port-to-port to Hamburg, loading at Shanghai / Ningbo.
The commercial term. This page starts from FOB, so main carriage, insurance, duty, VAT and destination charges sit with the importer. A CIF or DDP quote shifts some of those lines to the supplier, and the totals are no longer comparable line by line. Condition and compliance. Mixed consignments need separate lines. Sample sets and low-value kits may be valued differently. At the sample settings the expected total is $28,808, or $58 per unit.
Common questions
How much duty applies to parts & components imported into Germany from China?
The category planning band is 0%–2.7% of the CIF customs value, with 1.7% as the expected case. Duty is assessed on CIF (customs value includes freight and insurance to the EU border). This is a category band, not a ruling for your exact 8-10 digit line.
What is the all-in landed cost for the sample shipment?
The sample moves 500 units of new industrial parts with $20,000 FOB value, 25 CBM and 10000 kg by sea. Expected landed cost is $28,808, or $58 per unit, with a range of $27,294-$30,394.
Are there additional tariffs on this lane?
No origin-specific additional measure is modelled for this lane. That does not mean none applies: anti-dumping, safeguard or product-specific measures can still attach at the 8-digit tariff line, so confirm before contracting.
How long does sea freight take from China?
The destination file models 32–42 days port-to-port to Hamburg. Loading is assumed at Shanghai / Ningbo. Actual transit depends on carrier, sailing schedule, congestion and inland routing.
What should I confirm before signing?
Confirm the 8-10 digit national tariff line, the Incoterm and named place, the forwarder quote against the assumed 25 CBM / 10000 kg, and the documents required for your product type. Replace each assumption with a confirmed figure before you commit.