Importing from China
The China row in the table above is the reference case: 1000 new cotton apparel, $15,000 FOB, sea freight and FOB terms. Duty is assessed on FOB (transaction value; international freight and insurance are not part of the US duty base), so the customs value is the goods plus international freight plus insurance. There is no federal import VAT at this destination, so duty is the only border tax in this model. The model also applies Section 301 tariff (China-origin, List 4A) at 7.5% on FOB to China-origin goods; no other origin on this page carries that measure.
Landing the container is not the end of the cost. Clearance, port handling, inland delivery and documentation are modelled at $1,130, and cargo insurance at $74. A remote warehouse, a bonded transfer, demurrage or a customs exam pushes those lines higher. The buyer also needs a registered importer of record at the US; a forwarder cannot transfer that status by contract. Replace each assumption with a confirmed figure before contracting.
How the duty band is set
The planning band for apparel at this destination is 16%–32% of the FOB value, and this page uses 20% as the expected case. The band belongs to the category, not to a single product: your 8–10 digit national line carries the actual rate and may attract its own measures. The three HS candidates below usually cover the family, and each links to a duty file that compares the same code across the US, UAE and Saudi Arabia.
| HS line | Covers | Duty band |
|---|---|---|
| 6203.42 | Men's or boys' trousers and shorts of cotton | 16%–32% |
| 6109.10 | T-shirts, singlets and vests of cotton, knitted | 16%–32% |
| 6204.62 | Women's or girls' trousers and shorts of cotton | 16%–32% |
Fibre, knit status, gender and garment type determine the line. Duty rates can be high and product-specific.
What changes the total
Freight mode. The comparison table uses a 40HQ reference of $3,350 from the base origin, multiplied by each origin factor. The worked sample instead moves 1000 new cotton apparel at 10 CBM and 1000 kg by lcl, so its freight line is $1,350. Do not compare that line with a container rate: they describe different shipments. Transit is 25–35 days port-to-port to Los Angeles, loading at Shanghai / Ningbo.
The commercial term. This page starts from FOB, so main carriage, insurance, duty, VAT and destination charges sit with the importer. A CIF or DDP quote shifts some of those lines to the supplier, and the totals are no longer comparable line by line. Condition and compliance. Labelling, fibre composition and flammability rules apply in many markets. Branded goods raise IP concerns. At the sample settings the expected total is $21,749, or $22 per unit.
Common questions
How much duty applies to apparel imported into the US from China?
The category planning band is 16%–32% of the FOB customs value, with 20% as the expected case. Duty is assessed on FOB (transaction value; international freight and insurance are not part of the US duty base). This is a category band, not a ruling for your exact 8-10 digit line.
What is the all-in landed cost for the sample shipment?
The sample moves 1000 units of new cotton apparel with $15,000 FOB value, 10 CBM and 1000 kg by sea. Expected landed cost is $21,749, or $22 per unit, with a range of $20,469-$24,428.
Does a Section 301 tariff apply to this lane?
Section 301 tariff (China-origin, List 4A) is modelled at 7.5% on FOB for China-origin goods. List 4A Annex A covers 6109.10.00, 6203.42.07, 6203.42.45, 6204.62.15 and 6204.62.80. Other 8-digit lines in the same 6-digit family may be outside the list; confirm the entry line.
How long does sea freight take from China?
The destination file models 25–35 days port-to-port to Los Angeles. Loading is assumed at Shanghai / Ningbo. Actual transit depends on carrier, sailing schedule, congestion and inland routing.
What should I confirm before signing?
Confirm the 8-10 digit national tariff line, the Incoterm and named place, the forwarder quote against the assumed 10 CBM / 1000 kg, and the documents required for your product type. Replace each assumption with a confirmed figure before you commit.