Describe it like a message
Product, quantity, lane and value. “100 used speakers from China to Dubai, FOB $20,000” is enough to start.
AI import cost intelligence · US · UAE · Saudi Arabia
Describe your shipment in plain English. We separate the goods price from freight, duty, VAT and the charges that appear at the border — then show you a range you can defend in a supplier negotiation.
The calculator is designed around what an importer actually knows. You do not need to learn HS chapters before you can get a useful answer.
Product, quantity, lane and value. “100 used speakers from China to Dubai, FOB $20,000” is enough to start.
Every extracted field is visible. We flag assumptions, show missing information and ask one question that actually changes the result.
Freight, duty, VAT, clearance, port and inland delivery stay separate. Low, expected and high cases show where uncertainty lives.
Save the report, compare destination countries, solve back to a maximum FOB, or ask a broker to verify the assumptions.
Most import calculators stop at duty. The decisions that matter start after you know the duty: can I afford the goods, which border is cheaper, is the supplier quote complete?
The reverse calculation
Most calculators only go one way: FOB in, landed cost out. Reverse FOB starts with the number you can sell at and solves for the maximum FOB you can pay — including the duty and VAT that scale with the purchase price.
Open Reverse FOB →Illustrative arithmetic. The live tool solves against your lane, quantity and shipping mode.
We would rather be honest about three markets than shallow about thirty. These lanes have category-level duty ranges, local charge models and source records. Other destinations are planning coverage only.
| Lane | Sea transit | Duty planning rate | VAT / GST | Watch-out | |
|---|---|---|---|---|---|
| CN → USLos Angeles / Long Beach | 25–35 days | 0–3.9% | None federal | Section 301 may apply by HTS line | Open file → |
| CN → AEJebel Ali | 18–26 days | 5% | 5% | Free-zone entry is not mainland entry | Open file → |
| CN → SAJeddah / Dammam | 22–32 days | 5% | 15% | SABER conformity before release | Open file → |
| DE → USNew York / Newark | 18–28 days | 0–3.9% | None federal | Origin and valuation still matter | Open file → |
Sea transit and planning rates are illustrative lane ranges, not schedules or rulings. Last reviewed 2026-11-01.
A single precise number hides the most important part of an import estimate. Every line in a FOBtoDDP report carries its evidence level and its basis.
The supplier price, quantity, origin or destination you supplied. Editable, never silently overwritten.
A published category planning rate, statutory fee or VAT rate. The source and review date are attached.
Freight, clearance, port and inland charges. Useful for a decision, not a substitute for a quote.
Classification, permits or a route we do not cover. It is called out instead of filled with a guess.
Duty rates, trade measures and VAT rules change. Tell us the lane and category you actually import; we will only write when something relevant changes.
Start with the sentence you already have
No sign-up. No HS chapter required. A first range before your supplier call ends.
Calculate landed cost →